Latest current affairs · 23–24 Sep
Enrol · ₹3,500
Latest current affairs23–24 Sep
Skip to content

Proba-3 mission launch delayed to December 5 due to anomaly: ISRO

1 min read
All exams GA
PTI12 02 2024 000355B
Credit: The Hindu

Proba-3 Mission Launch Update

Recast Launch

  • The PSLV-C59/Proba-3 launch has been postponed from December 4, 2024, to December 5, 2024, due to an anomaly found in the Proba-3 spacecraft.
  • Announcement made by the Indian Space Research Organisation (ISRO).

Mission Overview

  • Proba-3 is a mission of the European Space Agency (ESA).
  • Launch vehicle: ISRO’s Polar Satellite Launch Vehicle (PSLV).
  • Launch site: Satish Dhawan Space Centre.

Key Features of Proba-3

  • First-of-its-kind Mission:
    • Proba-3 is the world’s first precision formation flying mission.
  • Formation Flying Concept:
    • Two satellites will fly together in a fixed configuration, resembling a single large rigid space structure.
    • Demonstrates formation flying and rendezvous technologies.

Scientific Objective

  • The mission aims to undertake a mega science experiment.
  • Unique Shadow Casting:
    • One satellite will align exactly in front of the other, casting an accurate shadow at a distance of 150 m.
    • Achieves a positional precision of one millimetre.
Free · NABARD Grade A Want the free material for this exam?

ARD notes, the monthly current affairs PDF and a descriptive English sample — all free, on WhatsApp.

or just leave your number
Only study material and course updates. No spam.