Latest current affairs · 14 Oct
Enrol · ₹3,500
Latest current affairs14 Oct
Free live webinar · NABARD Sprint 60: the 2025 cut-offs and your 60-day Phase I plan · Sun, 18 Oct at 7:30 PM ISTJoin free
Skip to content

India Launches NASA–ISRO NISAR Satellite

1 min read
All exams GA
In one line

Context:

India successfully launched the NASA–ISRO Synthetic Aperture Radar (NISAR) satellite from the Satish Dhawan Space Centre, Sriharikota, on July 31, 2025, aboard the GSLV-F16 rocket. This marks the first collaborative Earth observation mission between ISRO and NASA and a major step in global climate and disaster monitoring.

What is NISAR?

  • Full Form: NASA–ISRO Synthetic Aperture Radar
  • Mission Type: Earth observation using dual-frequency synthetic aperture radar (SAR)
  • Mission Duration: 5 years (2025–2030)
  • Orbit: Sun-synchronous polar orbit at 747 km altitude
  • Launch Vehicle: GSLV-F16 (first GSLV mission into polar orbit)

Mission Objectives

  • Monitor minute land and ice surface changes at centimetre-level precision
  • Detect and forecast natural disasters including earthquakes, floods, landslides, and volcanic activity
  • Track changes in vegetation, wetlands, glaciers, and soil moisture
  • Aid sectors like agriculture, infrastructure, water, and climate management

Technological Features

  • Dual-frequency SAR capability:
    • L-band (NASA) for deeper surface penetration
    • S-band (ISRO) for higher-resolution imaging
  • 242 km swath width with global revisit every 12 days
  • All-weather, 24/7 imaging capability — works through clouds and darkness
  • 12-metre deployable reflector antenna enables SweepSAR for wide-area monitoring

Contributions by NASA and ISRO

Free live session

NABARD Sprint 60: the 2025 cut-offs and your 60-day Phase I plan

8 of the top 10 in NABARD Grade A 2025, Rank 1 included, and Rank 1 back to back before that in 2021 and 2022: all prepared with C4S. The 2025 cycle was the toughest on record at every stage. This session reads those numbers properly and turns them into a 60-day, week-by-week plan for Phase I.

In 3 days · Sun, 18 Oct at 7:30 PM IST · 75 minutes · free

Register free →
AgencyKey Contributions
NASAL-band radar, boom, reflector antenna, GPS, solid-state recorder, and telecom system
ISROS-band radar, satellite bus (I-3K), launch via GSLV-F16, solar arrays, data and ground systems

TH

Free PDF · print or read offline Download this page as a PDF

A clean PDF of this page with the C4S header — it opens right away, and the link comes to your WhatsApp too.

The link opens at once. After that, only study material and course updates. No spam.

Related on Clarity 4 Sure

WhatsApp