The Green Energy Corridor Phase-III Scheme

1 min read Source: News on
All exams GA
In one line

The Union Cabinet approved the Green Energy Corridor Phase-III (GEC-III) scheme with an outlay of ₹1,86,405 crore.

Context

What It Is

Free live session

NABARD Grade A 2026: what the 2025 cut-offs changed, and the 90-day plan

The 2025 cycle was the toughest on record at every stage. This session reads those numbers properly and turns them into a week-by-week plan for Phase 1.

Today · 7:30 PM IST · 75 minutes · free

Register free →
  • A flagship central infrastructure scheme to expand and modernise state-level transmission grids (InSTS)
  • Renewable Energy Evacuation: The scheme will enable evacuation of up to 135 GW of renewable energy across States/UTs.
  • Battery Energy Storage: 50 GWh of Battery Energy Storage Systems (BESS) will be deployed to improve grid flexibility.
  • Total Outlay:₹1,86,405 crore
    • ₹1,36,378 crore – Intra-State Transmission Systems
    • ₹50,000 crore – 50 GWh BESS
  • Central Financial Support:₹54,082 crore
    • This will help reduce intra-state transmission charges, ultimately keeping electricity costs lower.
  • Target: The projects are planned for completion by FY 2032-33.
  • Non-Fossil Energy Target: GEC-III will support India’s goal of 900 GW installed non-fossil fuel capacity by 2035.
  • Nodal Ministry: Ministry of New and Renewable Energy (MNRE)
Free PDF · print or read offline Download this page as a PDF

A clean PDF of this page with the C4S header — it opens right away, and the link comes to your WhatsApp too.

The link opens at once. After that, only study material and course updates. No spam.

Important Facts for Examsmost asked

  • Green Energy Corridor (GEC): Transmission network designed to integrate and evacuate electricity generated from renewable energy sources.
  • Intra-State Transmission System (InSTS): Transmission network used to transfer electricity within a State.
  • BESS: Battery-based system that stores electricity and supplies it when required.
  • TBCB: A competitive bidding system where transmission projects are awarded to the bidder offering the required service at the most competitive tariff.
  • BOOM: Build-Own-Operate-Maintain model in which a private transmission provider builds, owns, operates and maintains the infrastructure.
  • Brownfield Project: Expansion, upgrading or strengthening of an existing infrastructure/network.
  • Non-Fossil Capacity: Power capacity based on sources such as solar, wind, hydro and nuclear, rather than fossil fuels.