Latest current affairs · 9 Nov
Enrol · ₹3,500
Latest current affairs9 Nov
Skip to content

Second Batch of Phase 2 Capacity-Building under NAKSHA Programme

1 min read
RBI Grade BNABARD ESISEBI
In one line

Context:

“RBI MPC Unpacked: Key Theory Meets Today’s Macro Trends”Tap to play · from the C4S channel

More on this exam

The Department of Land Resources (DoLR), under the Ministry of Rural Development, Government of India, has announced the launch of the second batch of Phase 2 of its capacity-building programme under the NAKSHA (National Geospatial Knowledge-based Land Survey of Urban Habitations) initiative. The programme commences on June 16, 2025, with training to be conducted across four Centres of Excellence (CoEs) nationwide.

Objectives

The training is designed to empower ULB-level and district officials with the technical competencies to carry out high-precision urban property surveys. Modules include:

  • GNSS and ETS-based land surveying
  • Web-GIS platforms for urban mapping
  • Land parcel mapping and digitization
  • Legal and administrative frameworks for land record modernization
  • Implementation of the NAKSHA framework in real-time survey operations

About NAKSHA

The NAKSHA programme is a pioneering geospatial initiative launched by DoLR in partnership with:

  • Survey of India
  • NICSI
  • MPSeDC
  • Five Centres of Excellence

It is currently being piloted in 157 ULBs across 27 States and 3 Union Territories, and aims to meet the growing demand for accurate, accessible, and verifiable urban land records, especially as India’s urban population is projected to cross 600 million by 2031.

Free PDF · print or read offline Download this page as a PDF

A clean PDF of this page with the C4S header — it opens right away, and the link comes to your WhatsApp too.

The link opens at once. After that, only study material and course updates. No spam.

Related on Clarity 4 Sure

WhatsApp